Fehmarn Belt Tunnel, Rødby
Lukas Kresten Schouw RytterMarch 2025© KSR Cranes
The project at the Fehmarn Belt Tunnel in Rødby involves handling and assembly of steel elements as well as casting of in-situ formwork in connection with the production of test elements. The work is carried out using a Liebherr 1000 EC-H tower crane with dual hoist in a 4-cut configuration.
Images from the project

Do you need experienced crane operators?
We provide qualified crane operators for construction and lifting work across Denmark. Reach out for a short, no-obligation talk.
Copyright notice: This image is protected by copyright. All rights reserved by KSR Cranes.